HM 41. The performance of turbine meters in loading gantries - A review of proving and test data (formerly PMP No. 9). Supplement to HM 18.

Document options


EI Technical Partners get free access to publications. You will need to Login or Register here

  • Published: July 2001
  • REF/ISBN: 9780852933435
  • Edition: 1st
  • Status: Obsolete

This publication has been superseded by HM 9.

HM 18 specifies the procedures for proving turbine meters in road or rail loading gantry installations. The procedures are based on those employed for proving positive displacement meters, but make allowance for the special requirements of turbine meters. Many of the problems associated with the use of turbine meters in the limited space available and with the variations of pipework in gantry installations, have been appreciated for some time. The magnitude of the effects and the actions that may be taken to mitigate them are less well understood.

Industry has generated a significant amount of data on the performance of turbine meters, both through special test programmes and through routine proving. This HM document (formerly PMP No 9) presents data derived from this work (made available by the oil companies involved) and from research programmes sponsored by the IP, to provide the basis for the proving recommendations.

Summaries of the results are presented and discussed below under three separate headings:

  • Data derived from routine proving operations.
  • Data generated during field tests or trials.
  • Data produced in flow laboratory tests or other tests under controlled conditions.

Members Benefits

Are you an EI Member? If yes, register/log in now to ensure you receive free access or discounts to EI publications.

If you are not a Member, why not join today and receive all of the benefits of EI Membership? EI Members are entitled to a 25% discount on most EI publications.